Stantec Tower is a mixed-use skyscraper currently under construction and almost completed in the Ice District in downtown Edmonton, Alberta.
Aqua Air Systems supplied Halton’s Pollution Control Unit (PCU) for the Stantec Tower in 2019 to remove exhaust air along with grease, smoke, and odor from the kitchen exhaust system as per ASHRAE standard 52.2-2007.