Four existing air handler units were removed and replaced with 4 custom Ventrol Air Handling Units. Due to the tight constraints of working with an existing building, Aqua Air supplied 4 knockdown units which were able to fit through a standard doorway, allowing the units to be assembled in the space without additional demolition of walls/doors.
The 2 units located in the upper mechanical room were constructed of lightweight aluminum to reduce due to the weight restrictions set out by the structural engineer